Influence of trade-level coordination problems on project productivity
journal contribution
posted on 2017-12-06, 00:00 authored by BG Hwang, Xianbo ZhaoXianbo Zhao, THV DoThis study aims to investigate the influence of coordination problems in glass and metal curtain wall (GMCW) installation on project productivity in Singapore. Trade-level coordination problems in GMCW installation were identified through literature review and included in a survey questionnaire. The survey results indicated that, on average, 66.5 days of rework and 52.5 days of waiting resulted from coordination problems, and that “last-minute changes in design by the client” led to the longest rework and waiting time. Additionally, the rework and waiting time caused by trade-level coordination problems were correlated with the total rework and waiting time.
History
Volume
45Issue
5Start Page
5End Page
14Number of Pages
10eISSN
1938-9507ISSN
8756-9728Location
United StatesPublisher
John Wiley & SonsPublisher DOI
Full Text URL
Language
en-ausPeer Reviewed
- Yes
Open Access
- No
External Author Affiliations
701 Search Pte Ltd (Singapore); National University of Singapore; School of Engineering and Technology (2013- ); TBA Research Institute;Era Eligible
- Yes