CQUniversity
Browse

File(s) not publicly available

Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects

journal contribution
posted on 2023-03-08, 04:22 authored by Muhammad Saiful Islam, Madhav P Nepal, Martin Skitmore, Meghdad Attarzadeh
Fuzzy and hybrid methods have been increasingly used in construction risk management research and this study aims to compile and analyse the basic concepts and methods applied in this field to date. A content analysis is made of a comprehensive literature review of publications during 2005–2017. It is found that the nature of complex projects is such that most risks are interdependent of each other. Therefore, a fuzzy structured method such as the fuzzy analytical network process (FANP) has frequently been used for different complex projects. However, the application of FANP is limited because of the tedious and lengthy calculations required for the pairwise comparisons needed and an inability to incorporate new information into the risk structure. To overcome this constraint, a fuzzy Bayesian belief network (FBBN) has been increasingly used for risk assessment. Further project-specific studies based on FBBN are recommended to justify its broader application. Beyond fuzzy methods, the Credal network – an extended form of Bayesian network- is found to have potential for risk assessment under uncertainty.

History

Volume

33

Start Page

112

End Page

131

Number of Pages

20

eISSN

1873-5320

ISSN

1474-0346

Publisher

Elsevier

Language

en

Peer Reviewed

  • Yes

Open Access

  • No

Acceptance Date

2017-06-01

External Author Affiliations

Nanyang Technological University, Singapore; Queensland University of Technology

Era Eligible

  • Yes

Journal

Advanced Engineering Informatics

Usage metrics

    CQUniversity

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC