CQUniversity
Browse

Client attributes that motivate contractors' bid decision

journal contribution
posted on 2024-09-04, 01:14 authored by OA Olatunji, Chamil RamanayakaChamil Ramanayaka
Purpose: This study aims to investigate clients' attributes, their key decision variables and causal relationships between the decision variables. In addition, the purpose of the study is to map-out from these analyses, the attributes of project clients that motivate contractors' bid decision. Design/methodology/approach: A total of 50 responses were obtained from a questionnaire survey. 50% of participants are contractors. 44% are claims consultants, whilst 6% are manufacturers and clients. Beyond measures of central tendencies, analysis focussed on causal relationships by way of correlation, analysis of variance and reductionism. Findings: All 20 factors considered have significant correlations with at least one other factor. Findings also show the factors can be clustered into six: reputation, financial strength, relationship with the bidder, organisational attributes, history with project attributes and project organisation. Practical implications: Evidence suggests stakeholders have often struggled to consider the many decision factors reported in normative literature, numbering hundreds. By clustering the factors into sub-themes, bid decisioning has been made more efficient. The study also explains how client attributes could determine project success and contractor participation. Different stakeholders can use findings of this study for training and further studies. Originality/value: Previous studies have considered bid decisioning indexically – factors were long, analyses were largely inconclusive, and causal relationships are orthogonal. Findings in this study have shown depth: 20 originating client-specific factors were clustered into six sub-themes, and correlations were established. The methodology used for the study is confirmatory and conclusive.

History

Volume

13

Issue

6

Start Page

799

End Page

812

Number of Pages

14

eISSN

2044-1258

ISSN

2044-124X

Publisher

Emerald

Language

en

Peer Reviewed

  • Yes

Open Access

  • No

Acceptance Date

2023-05-12

Era Eligible

  • Yes

Journal

Built Environment Project and Asset Management

Usage metrics

    CQUniversity

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC